TEST Every BOe Flashback
Arrestor is tested individually for body leaks, function of its
non-return valve, cutoff valve and relief valve and is subjected
to flashback testing at the maximum rated operating pressure in
accordance with ISO Standards or those of the country of sale.
MAINTENANACE
No maintenance is required. Nevertheless it is recommended that
at annual intervals the units are tested with clean dry air or nitrogen
for body leakage and for proper function of the valves. Test specifications
and test equipment available on request.
REPAIR
Defective units should only be serviced by the manufacturer or his
authorised local representative as full testing including flashback
testing after reassembly is required. The change of this dirt filter
is not part of this requirement and can easily be carried out.
MAINTENANACE
No maintenance is required. Nevertheless it is recommended that
at annual intervals the units are tested with clean dry air or nitrogen
for body leakage and for proper function of the valves. Test specifications
and test equipment available on request.
REPAIR
Defective units should only be serviced by the manufacturer or his
authorised local representative as full testing including flashback
testing after reassembly is required. The change of this dirt filter
is not part of this requirement and can easily be carried out.
INSTALLATION
The BOe F I Flashback Arrestor maybe installed at regulator or pipeline
outlets. For pipelines use a shut-off valve should be fitted immediately
upstream of the arrestor. If there is a danger from water vapor
being carried with the gas, then a seperator should be installed
upstream. The arrestor may be mounted horizontally, vertically or
any other position. The maximum working temperature is 70°C. |